Ineco has been working since 2009 on the implementation of the new arterial railway line in Valladolid.
Due to its location, Valladolid and its vicinity have strong links with the railway both in its conventional and high speed modes. In the latter case it is an authentic junction town. To finish the North (Asturias, Cantabria and the Basque Country) and Northwest (Galicia) corridors it was necessary to remodel the entire rail network, eliminating at the same time the barrier effect it generates in the town´s urban area.The rapid urban growth of Valladolid in recent decades, especially since the advent of the railway, caused a structural conflict precisely between these two sectors. Ever since the arrival of the AVE (HSR) became public knowledge, a study was begun into the possibility of reforming the rail network to make it compatible with urban development and, as a result, improving the railway system of the city and its surroundings.